Search  
  Language

Case studies

Ashworth Hospital

Whittle Construction contacted us to lay flooring in the Seclusion Suite in the Tennyson Ward at Ashworth Hospital.

Acrylicon Decor System flooring was laid to their existing concrete surface. Our 75mm Acropol underlayment and our 4mm Acrylicon Décor System were laid. The area was completed with coving and 8mm R17 to bed in the heating cables. The project was completed in 4 days.

Date Started: 13/04/04