Case studies
- Canada
- Europe
- AJ + RG Barber
- Anglian Water - Rutland
- Asda
- Ashworth Hospital - Liverpool
- Askeys
- Billingsgate Market - London
- Bombay Brasserie - London
- G's Beetroot
- Green Field Produce
- Harrods - Knightsbridge, London
- Hilton Meats Retail
- HMP Haverigg- Cumbria
- I.H. Foods Ltd - Middlesex
- John Lewis - Cheadle
- John Lewis - Trafford Centre, Manchester
- John Radcliffe Hospital
- Kepak Processing Plant, Kirkham
- M&J Seafoods (Brake Bros), London
- Man Roland Great Britain Ltd
- Mid Staffordshire General Hospital
- Middlesbrough Football Club
- WM Morrison Supermarkets - Leeds
- Moto Services
- Noon Products Ltd.
- Quaglinos Restaurant - London
- Richmond Foods Group
- Scottish & Newcastle
- Shire Foods of Warwick Ltd
- St Paul’s School - Withington, Manchester
- Sun Valley Foods - Wirral
- The Oval Cricket Ground - London
- University of Manchester
- Vale of Mowbray
- Middle East
- North America
- Rest of World
- Scandinavia
G's Fresh Beetroot
Acrylicon was the first choice for G’s Fresh Beetroot when looking for Industrial Flooring having already had most of the factory floor laid with Acrylicon Decor System.
Beetroot preparation has always been a problem for floors due to the adding of Vinegars and the temperature of the ovens used to cook them. Acrylicon had been chosen as a potential solution to these problems due to its unique properties. After only a few years the decision to buy an Acrylicon floor proved to be a correct one and since then we have been back several times laying more areas in the production facility.
With thier faith in the product and our laying ability assured, they then asked us what we could do for other areas of the factory.
The first area- Low Corridor had Vinyl that was wearing and becoming hard to clean. We replaced it with 68m2 of our 2mm Acrylicon Granito Flake System, with coving and kerbs which are easy to clean, hard wearing and very decorative.
The second area - Flat Pack Area had no appled finish on it and was beggining to suffer. 181m2, was to be done in our 5mm Acrylicon Décor Plus System, with F10 joints to allow for expansion.
The Granito Flake system was completed in 5 days and the Décor system in 4 days.
Date Started: 17/01/05
UPDATE 16-12-06: We have since been back and done another area of 500m2 in their new Vac-Pak extension in Acrylicon Decor System.
Fred Foreman - Chief Engineer
Key Facts
- Resists Beetroot juice
- Chosen for longevity
- Low Maintenance
- Product
Decor System - Location
Europe - Solution
Fresh Prepared Foods - News
G's Beetroot