HM Prison Service contacted us to replace the 8mm epoxy screed in the kitchen area of HMP Haverigg.

With a total area of 476m2 and 270m of coving, the existing floor was replaced by our 4mm Acrylicon Décor system, coving and F10 expansion joints.

All work was completed at night in small windows over a 15 day period. Because of Acrylicon’s unique ability to chemically bond, a seamless hygienic floor was created.

Date Started: 7/06/04