Vale of Mowbray, Leeming Bar

After carrying out flooring repairs to their existing factory, they quickly saw the benefits of Acrylicon Systems, not only on installation, but also in the long term.

When they decided to expand and build a new factory over the road, they chose Acrylicon Décor System. We laid a total of 3000m.sq. with 600m of coving 500mm high. We also installed Stainless Steel surface drainage, Stainless steel bump barriers and dowelled concrete kerbs.

Completed: March 2003