- Aalesundfisk AS - Fish Processing
- Annas Pepperkakor
- Brynild Fabrikker - Fredrikstad
- Fjordlaks - Ålesund
- Forsvaret - Norwegian Military Troms, Setermoen
- Frederikke
- Gilde - Abattoir and Meat Production, Gol
- Global Fish
- Hartwall Breweries
- Hennig Olsen Is
- Hydro Agri - Glomfjord
- Hydro Seafood, Frøya
- Melbu Fiskeindustri
- NKL Trondheim
- Nordlaks - Salmon
- Rec Scancell, Narvik
- Sandnes Uldvarefabrikk
- Sarpsborg Post Terminal
- Scandinavian Airline System - Oslo
- Siva - Grøntvedt Fish
- Siva Lerum
- St. Olav Hospital - Trondheim
- Stabburet, Fredrikstad
- Tine Dairy - Tretten
- Tine Dairy - Verdal
- Tine Fosheim
- Tufjordbruket - Fjordlaks
- University of Trondheim -NTNU
- UPM-Kymmene, Voikkaa
I H Foods
Flooring to the Chicken Plant in I.H. Foods.
Riverside Stadium now in 13th year
Built in only 32 weeks in 1995, the Riverside Stadium was the first stadium designed and constructed to comply with the Taylor report. One of their main areas of concern was the flooring. They needed something that looked good, remained durable to the millions of footfall, could be installed quickly and above all was easy to clean.
WM Morrsons Supermartkets - Leeds Merrion Centre
Wm. Morrisons required a refurbishment to the floor in the busy store in the heart of Leeds City centre. We had to lay the floor with the minimum of disruption and ideally keep the store trading during normal opening hours.